A freestanding soaking tub filled with water can exceed 1,000 lbs on a concentrated floor area. We assess the structural capacity of your floor before we recommend a specific tub — because the most beautiful tub is useless if your floor can't support it.
A freestanding soaking tub filled with water can exceed 1,000 lbs on a concentrated floor area. We assess the structural capacity of your floor before we recommend a specific tub — because the most beautiful tub is useless if your floor can't support it.
Every project we manage under this scope is permitted through Sarasota County, managed under CGC#1533136, and closed with full inspection documentation. We coordinate all trades on a single schedule — no waiting weeks between plumber, tile setter, and electrician.
Florida climate note: Sarasota's humidity and salt air create specific material selection requirements that differ from northern markets. We advise on materials that perform well in coastal Florida environments — not just what looks good in a catalog.
All work performed under CGC#1533136. Permits pulled and managed through Sarasota County with full inspection closeout documentation provided at project completion.
We manage plumbing, electrical, tile, and finish trades on a coordinated schedule. No gaps between trades that extend your project timeline unnecessarily.
We assess existing conditions before pricing — identifying any moisture damage, structural concerns, or permit requirements specific to your project before you commit.
We walk the project, assess existing conditions, identify any moisture or structural issues, and determine permit requirements before providing pricing.
We develop a detailed scope with material specifications appropriate for Florida's climate — guiding your selections based on performance, not just aesthetics.
Permits pulled and managed. Work scheduled to minimize disruption with clear milestones and communication throughout the project.
Do I need a permit for this work in Sarasota County?
It depends on the specific scope. Any work that moves plumbing, adds electrical circuits, or makes structural changes requires a permit. Like-for-like replacements typically don't. We assess this at the site walk and advise specifically based on your project — never leaving you exposed to unpermitted work risk.
How long will my project take?
Timeline depends on scope complexity, permit review time, and material lead times. We provide a realistic timeline at the proposal stage based on your specific project — not a generic estimate. We build schedules around your needs, including occupied renovation phasing when you can't vacate the space.
How do I get a free assessment?
Call us at 941-412-4901 or use the contact form on our website. We schedule site walks within 2–5 business days and provide written scope and pricing within 5–7 days of the visit. No obligation, no sales pressure.
Schedule a free site walk with Michael Greig. Honest scope, real pricing, no obligation.
Schedule a Free Consultation Back to Bathroom Remodeling